Streamline
Season 2 · Episode 10 of 28 Aired Aug 17, 2005

North Sea Wall

Wed, Aug 17, 2005
Streaming on Hulu, Prime Video, Amazon Freevee, Tubi TV + 3 more
0 of 28 watched this season
Next: S2 E11

A historic and present look at Holland's efforts to hold on to their precious land from floods as a result of rising sea levels and climate changes. After a storm in 1916, the Dutch began a labor intensive construction of a Barrier Dam in 1923, stretching 30 km in length. It resulted in the reclamation of 165,000 ha of new land, and creation of a fresh water lake. However, in 1953, a combination of a hurricane and high spring tides caused the North Sea waters to force through the barrier and flood the Dutch coastline, resulting in the loss of over 1,800 lives and 47,000 livestock. The disaster resulted in Holland's creation of the 'Delta Project'. Costing billions of dollars, the project began in 1958. The project consisted of the construction of concrete dams, steel sea walls and retractable floodgates. Environmental considerations also led to the construction of the storm surge barrier in the Eastern Scheldt, one of the biggest in the world. It consists of 2 floating gates built on special docks. The vast gates are controlled by a computer system that allows the gates to be kept open but closes when a flood is imminent. Also presented are current emergency plans that include allocation of certain areas of land to be flooded during worse case flooding..

Where to watch

You cover 0/159 episodes +159 with the plan · 100%
Your services
With the plan
Not covered
Also available on 5
Amazon Freevee
Pluto TV
Prime Video

Every episode is already streaming. You only need about a month to binge it.

Jun Jul Aug Sep Oct Nov

Subscribe ~1 month · binge all 159 episodes, then cancel

Notes & ratings

0 ratings

0 notes

0 25 50 75 100

Airs

Wed, Aug 17, 2005

Show

Megastructures

159 episodes

Episode

S2 · E10

in Megastructures