Streamline
Season 3 · Episode 2 of 12 Aired May 13, 2010

Extreme Bridges

Thu, May 13, 2010 · 51 min
0 of 12 watched this season
Next: S3 E3

Riley crosses the pond to scale three iconic bridges in the U.K. The famed Tower Bridge in London is being restored, and the lead paint being stripped must be contained. In Scotland, he'll construct scaffolding at the top of the Forth Bridge, a vertigo-inducing 367 feet over the water! Just upriver, he helps implement an experimental technique to prevent a suspension bridge from collapsing.

Notes & ratings

0 ratings

0 notes

0 25 50 75 100

Airs

Thu, May 13, 2010

51 min

Show

World's Toughest Fixes

27 episodes

Episode

S3 · E2

in World's Toughest Fixes