Home Again with Bob Vila
Notes & ratings
0 ratings
0 notes
Season 8
-
1
E1
Craftsman Bungalow: Project Introduction
A vintage Sears kit house is restored, but historic and sentimental elements are preserved.
Sep 1, 1997 -
2
E2
Craftsman Bungalow: Wiring, Plumbing and Plastering
A closet is transformed into a bathroom, while new and old building materials are blended in the living and dining rooms.
Sep 8, 1997 -
3
E3
Craftsman Bungalow: Reconditioning the Windows
Bob Vila oversees the reconditioning of an original window in the Sears kit house. Also: a tour of Frank Lloyd Wright's Hollyhock House.
Sep 15, 1997 -
4
E4
Craftsman Bungalow: Interior Trim and Porch Framing
Interior trim details are custom-milled as per the architect's specifications, and original bathroom fixtures are re-porcelainized. Also: framing continues on the back porch.
Sep 22, 1997 -
5
E5
Craftsman Bungalow: Repairing the Front Facade
Vintage cabinetry is discovered in a salvage yard and installed in the kitchen; yellow paint is stripped off; and the facade is given a facelift.
Sep 29, 1997 -
6
E6
Craftsman Bungalow: Swimming Pool and Porch
The pool crew finishes the rebar and sprays gunnite, while French doors are installed in the master bedroom and the porch roof is repaired.
Oct 6, 1997 -
7
E7
Craftsman Bungalow: Working On the Pool
Green Indian slate is installed on the surround and porch steps. Also: the backyard entry gate is finished.
Oct 13, 1997 -
8
E8
Craftsman Bungalow: Exterior Paint Preparation
At the Sears kit house, the exterior is stripped for priming and painting. Also: a tour of the CBS studio center.
Oct 20, 1997 -
9
E9
Craftsman Bungalow: Floor Tile and Cabinet Installation
The bathroom is tiled, new kitchen cabinets are custom-made to match the vintage ones, and decking is installed on the back porch.
Oct 27, 1997 -
10
E10
Craftsman Bungalow: Installing Custom Light Grids
The electrician installs back lighting in the living room, and six stained-glass panels are cut and assembled. Meanwhile, contractors insulate the roof.
Nov 3, 1997 -
11
E11
Craftsman Bungalow: Installing Cabinets
A cabinetmaker frames boxes for living-room built-ins to match existing ones in the kitchen, and the pool crew finishes the plaster.
Nov 10, 1997 -
12
E12
Craftsman Bungalow: Hardwood Floor Repair and Refinishing
Damaged hardwood flooring is repaired and an alder kitchen countertop is installed. Also: a tour of the Japanese Garden at Huntington Library and tips on building a Zen garden.
Nov 17, 1997 -
13
E13
Craftsman Bungalow: House Tour
Bob Vila leads a final tour of the landscaped front yard and the porch addition, which features a barbecue. Also toured are the Zen garden and swimming pool.
Nov 24, 1997 -
14
E14
Dream Garage: Project Introduction
Plans for a post-and-beam garage and boat storage project are discussed with an architect. Also: touring a marina with America's Cup champ Bill Koch.
Dec 1, 1997 -
15
E15
Dream Garage: Working On the Foundation
Foundation work is begun, while Bob Vila tours an antique car museum in a Shaker-style round barn in Sandwich, MA.
Dec 8, 1997 -
16
E16
Dream Garage: More Foundation Work
As the foundation is prepared, Bob Vila explains termite-proofing and oversees the installation of a hydronic heating system.
Dec 15, 1997 -
17
E17
Dream Garage: Framing the Garage
A look at framing, and the special techniques and tools that are used for it. Also: a tour of a lumber company examines pre-cut materials for the post-and-beam plan.
Dec 22, 1997 -
18
E18
Dream Garage: Framing and Decking
New decking is installed in the loft, while Bob Vila and the crew put up the ridge beam and rafters. Also: a joinery specialist demonstrates house framing.
Dec 29, 1997 -
19
E19
Dream Garage: Insulating the Garage
Insulation panels are installed and Bob Vila visits a factory where all-in-one wall product is made.
Jan 5, 1998 -
20
E20
Dream Garage: Exterior Trim and Siding
Windows, exterior trim and siding are installed. Also: a tour of the American Plywood Association lab, where quality testing is observed.
Jan 12, 1998 -
21
E21
Dream Garage: Skylights and Metal Roofing
Metal roofing is installed and drywall is put up around the skylights.
Jan 19, 1998 -
22
E22
Dream Garage: Installing Protective Features
Bob Vila takes a look at such safety features as motion detectors, a fire-suppression unit and a lightning rod.
Jan 26, 1998 -
23
E23
Dream Garage: Installing a Staircase and Paneling
A horticulturalist shares general landscaping tips and offers special advice on the use of native plants and trees. Also: building a staircase to the loft.
Feb 2, 1998 -
24
E24
Dream Garage: Heating and Lighting
A garage-door opener is installed, the heated-floor system is activated, and interior paneling is stained. Also: track lighting goes in.
Feb 9, 1998 -
25
E25
Dream Garage: Setting up the Workshop and Garage
The interior of the barn is stained and a workshop is assembled. Also: race-car driver Lyn St. James helps Bob Vila set up the automotive garage with new tools.
Feb 16, 1998 -
26
E26
Dream Garage: Barn Tour
Workbenches are completed and metal shelves are installed in the loft, before Bob Vila leads a tour of the finished barn.
Feb 23, 1998